Skip to Content

Blog Archives

Ikon Billboards


<

Description of Actual Services Provided by the Staff

calltoaction_banner_2022
Engineering Surveying, Materials investigations and testing, Drainage and Hydrological investigations and Structural and Civil engineering design and construction supervision. “(Preparation of Specifications, Bar Bending Schedules, working drawings, As Built drawings, assists in dispute resolution, issuing certificates of completion, preparation of schedules of defects and certifying the satisfactory completion of defects)”. Geometric design of factory road and layout. The approximate cost for the project was KES 2.5 Million.

READ MORE

Ushuru Sacco

Description of Actual Services Provided by the Staff

calltoaction_banner_2022
Engineering Surveying, Materials investigations and testing, Drainage and Hydrological investigations and Structural and Civil engineering design and construction supervision. “(Preparation of Specifications, Bar Bending Schedules, working drawings, As Built drawings, assists in dispute resolution, issuing certificates of completion, preparation of schedules of defects and certifying the satisfactory completion of defects)”. The approximate cost of the project was KES 700 Million.

READ MORE

Zamani Office Block

Description of Actual Services Provided by the Staff

calltoaction_banner_2022
Engineering Surveying, Materials investigations and testing, Drainage and Hydrological investigations and Structural and Civil engineering design and construction supervision. “(Preparation of Specifications, Bar Bending Schedules, working drawings, As Built drawings, assists in dispute resolution, issuing certificates of completion, preparation of schedules of defects and certifying the satisfactory completion of defects)”. the approximate cost for the project was KES 450 Million.

READ MORE

Standard chartered bank Muthaiga Groove

Description of Actual Services Provided by the Staff

calltoaction_banner
We at Apex Systems Consulting Group Limited undertook the civil/ structural design of the houses and also supervised their construction. The houses were designed as concrete frame structures. The approximate cost for the project was KES 135 Million.

READ MORE

GMEA

Description of Actual Services Provided by the Staff

calltoaction_banner_2022

READ MORE